Schoolhouse #8
Activities at the School Street Site
Previous page 7 of 21 Next

092 -  starting to spread top soil 093 -  Site is looking dramatically better 094 - Cutting hole to accept display cases 095 - Ready for the display cases 096 - The cabinets arrive
Starting to
spread topsoil
Site is looking
dramatically
better

Cutting hole
to accept
display cases
Ready for
the display
cases
The cabinets
arrive
097 - Cabinet on its way to schoolhouse 098 - Cabinet being eased into schoolhouse 099 - Cabinet being received inside 100 - All three cabinets in place 101 - cabinet with glass shelves installed
Cabinet on
its way to
schoolhouse

Cabinet being
eased into
schoolhouse
Cabinet being
received inside
All three
cabinets
in place
Cabinet with
glass shelves
installed
102 - Strategy session for draining around foundation 103 - Removing shale 104 - It helped to have toys 105 - Drain pipe in place 106 - Connectin g to main drain
Strategy
session for
draining around
foundation
Removing
shale
It helped to
have toys
Drain pipe
in place
Connecting
to main drain