Schoolhouse #8
Activities at the School Street Site
page 7 of 21
Starting to
spread topsoil
Site is looking
dramatically
better
Cutting hole
to accept
display cases
Ready for
the display
cases
The cabinets
arrive
Cabinet on
its way to
schoolhouse
Cabinet being
eased into
schoolhouse
Cabinet being
received inside
All three
cabinets
in place
Cabinet with
glass shelves
installed
Strategy
session for
draining around
foundation
Removing
shale
It helped to
have toys
Drain pipe
in place
Connecting
to main drain