Activities at the School Street Site
Previous page 8 of 21 Next

107 - Hauling top soil for backfilling 108 - 6th Graders planting daffodils 109 - More daffodils 110 - Applying clapboards on back side 111 -  Last clapboard applied
Hauling topsoil
for backfilling
6th Graders
planting
daffodils

More daffodils Applying
clapboards
on back side
Last clap-
board applied
112 - Connecting rope to bell 113 - Rope ready to pull 114 - Searching for buried gas lines 115 - Drain line buried along sidewalk 116 - Drain line hjeading for ditch
Connecting
rope to bell
Rope ready
to pull
Searching
for buried
gas lines

Drain line
buried along
sidewalk
Drain line
heading for
ditch
117 - Excavating on ditch side 118 - Driving pipe under sidewalk 119 - Work went on during the winter 120 - Desks were bolted to the floor 121 - This meeting was to apply for a grant
Excavating
on ditch side
Driving pipe
under
sidewalk
Work went
on during
the winter
Desks were
bolted to
the floor
This meeting
was to apply
for a grant