Schoolhouse #8
Activities at the School Street Site
page 6 of 21
The Fire Dept
cleaned the en-
tire parking lot
The first
blackboard
was mounted
The second
blackboard
was mounted
Vintage clock
was mounted
Map holder
and maps
installed
Financial
audit for NYS
was conducted
The piano
arrived
Started to
populate with
student desks
And we even
populated
with students
Fully populated
with student
desks
And the
teacher's desk
Starting to
dig drainage
ditches
We encount-
ered many
roots
Removing
shale from
temporary
driveway
Backfilling
trenches after
pipes were
installed