Schoolhouse #8
Activities at the School Street Site
Previous page 5 of 21 Next

061 - Cupola & Bell mounted in cupola 062 - Birds eye view of cupola and bell 063 - Flooring starts to go down 064 - Sanding starts 065 - Sander and supervisor
Cupola &
Bell mounted
in cupola
Birds-eye
view of
cupola
and bell
Flooring
starts to
go down
Sanding starts Sander and
supervisor
066 - Cleaning 067 - Floor all sanded and sealed 068 - vintage  door installed 069 - Salvaged flooring for re-use in entranceway 070 - Original flooring going down in entranceway
Cleaning Floor all
sanded and
sealed
Vintage door
installed
Salvaged
flooring for
re-use in
entranceway
Original
flooring going
down in
entranceway
071 - Vintage flooring installed 074 - Windows with tempered glass being installed 075 - More ditch dirt & more mud 076 - The Lawtons Fire Dept came to wash-down the parking lot  
Vintage
flooring
installed
Windows with
tempered
glass being
installed
More ditch
dirt & more
mud
The Lawtons
Fire Dept came
to wash down
the parking lot