Schoolhouse #8
Activities at the Ketchum Road Site
Previous page 4 of 6 Next

046 - Illustrates width of  wall planks 047 - Top view of wall with window removed 048 - Installing window 049 - First new Window installed 050 - Starting to replace portions of front wall
Illustrates
width of
wall planks
Top view of
wall with win-
dow removed
Installing
window
First new win-
dow installed
Starting to re-
place portions
of front wall
051 - Sections replaced 052 - Started work on lower beam on north side 053 - Removing rotted portion on north side 054 - View with beam removed 055 - Replacement beam installed
Sections
replaced
Started work on
lower beam on
north side
Removing rotted
portion on
north side
View with
beam removed
Replacement
beam installed
056 - Dowels used to secure beam to joist 057 - Replacement planks installed 058 - Starting to remove old flooring 059 - Preliminary look at the joist damage 060 - Salvaging portion of flooring for re-use
Dowels used
to secure
beam to joist
Replacement
planks installed
Starting to
remove old
flooring
Preliminary
look at the
joist damage
Salvaging
portion of floor-
ing for re-use