Activities at the Ketchum Road Site
Previous page 5 of 6 Next

061 - As found after removing 4  layers of flooring 062 - Some joists had significant bows 063 - Joists were sandwiched with 2x12s 064 - Shows 2 inch sag in some joists 065 - Installation of bolts to secure 2x12s
As found after
removing four
layers of flooring
Some joists had
significant bows
Joists were
sandwiched
with 2x12s
Shows 2-inch sag
in some joists
Installation
of bolts to
secure 2x12s
066 - Holes for re-bar to tie-in walls during transport 067 - Shows re-bar used to tie-in walls 068 - Re-bar secured on outside 069 - Sub-floor going down 070 - Progress being made with sub-floor
Holes for re-bar
to tie-in walls
during transport
Shows re-bar
used to
tie-in walls
Re-bar
secured
on outside
Sub-floor
going down
Progress being
made with
sub-floor
071 - Half the sub-floor is down 072 - Removing the old wooden shingles 073 - Covering with plywood 074 - Applied water & ice shield to entire roof 075 - Installing new trim and cornice on front
Half the sub-
floor is down
Removing the
old wooden
shingles
Covering with
plywood
Applied water
& ice shield
to entire roof
Installing new
trim and cornice
on front