Activities at the Ketchum Road Site
page 5 of 6
As found after
removing four
layers of flooring
Some joists had
significant bows
Joists were
sandwiched
with 2x12s
Shows 2-inch sag
in some joists
Installation
of bolts to
secure 2x12s
Holes for re-bar
to tie-in walls
during transport
Shows re-bar
used to
tie-in walls
Re-bar
secured
on outside
Sub-floor
going down
Progress being
made with
sub-floor
Half the sub-
floor is down
Removing the
old wooden
shingles
Covering with
plywood
Applied water
& ice shield
to entire roof
Installing new
trim and cornice
on front