031 - Assessing lower beam damage 032 - Found extensive deterioriation 033 - Starting to cutout bad section 034 - More cutting 035 - Securing new beam
Assessing lower
beam damage
Found extensive
deterioration
Starting to cut
out bad section
More cutting Securing
new beam
036 - Starting to restore wall 037 - Outside wall replaced 038 -  Re-nailing old planks 039 - Removing rotted boards on the inside 040 - Starting to replace wainscoting on inside
Starting to
restore wall
Outside wall
replaced
Re-nailing
old planks
Removing rotted
boards on the
inside
Starting to
replace wains-
coting on inside
041 - Filling the voids 042 - Using salvaged wainscot 043 - Wainscot from ceiling used as filler 044 - Replacing rotted wainscot 045 - One of eight rebuilt windows
Filling the
voids
Using salvaged
wainscot
Wainscot
used as filler
Replacing
rotted wainscot
One of eight
rebuilt windows