Schoolhouse #8
Activities at the Ketchum Road Site
Previous page 2 of 6 Next

016 - Theorizing why extra 2 windows on this side 017 - Starting to remove toilet section 018 - Salvaging wainscot from toilet section 019 - The best time of the day 020 - Removing clapboards on back side
Theorizing why
extra 2 windows
on this side
Starting to remove
toilet section
Salvaging wainscot
from toilet section
The best time
of the day
Removing clap-
boards on back side
021 - Preparing for removal of toilet section 022 - Side walls removed on toilet section_1 023 - Toilet section cut away_2 024 - Lots of cleanup and nail removal 025 - Foundation after toilet removal
Preparing for re-
moval of toilet section
Side walls removed
on toilet section (1)
Toilet section
cut away (2)
Lots of cleanup
and nail removal
Foundation after
toilet removal
026 - Note framing for 2 windows on the backside 027 - Making some adjustments 028 - Black felt paper being applied 029 - Back side covered with felt paper 030 -Evidence found of attempted burn
Note framing
for 2 windows
on the back side
Making some
adjustments
Black felt paper
being applied
Back side
covered with
felt paper
Evidence found
of attempted burn