001 - As it looked in 1999 002 -Ceiling in 1999 003 -Portion of Roof repaired in 1999 004 -Windows secured in 1999 005 -Securing the North side of roof in March 2003
As it looked
in 1999
Ceiling in 1999 Portion of roof
repaired in 1999
Windows
secured in 1999
Securing the north
side of roof
in March 2003
006 - Clean-up started 007 - Starting to get organized 008 -Reinforced rafters 009 -  Assessing water damage 010 - Both walls and beams rotted
Clean-up started Starting to get
organized
Reinforced
rafters
Assessing water
damage
Both walls and
beams rotted
011 - Cutting out rotten beam 012 - Measuring for replacement beam 013 - Shaping replacment beam 014 - Replacement beams installed 015 - Assessing the window situation
Cutting out
rotten beam
Measuring for re-
placement beam
Shaping re-
placement beam
Replacement
beams installed
Assessing the
window situation