Schoolhouse #8
Activities at the School Street Site
Previous page 11 of 21 Next

152 - The base for the flagpole is set in concrete 153 - The flagpole being installed 154 - Flag is raised 155 - Grading for the sidewalk 156 - The sidewalk area was compacted
The base for
the flagpole
is set in
concrete
The flagpole
being installed
Flag is
raised
Grading for
the sidewalk
The sidewalk
area was
compacted
157 -The sidewalk stone is in place 158 - The grass is finally tall enough to mow 159 - This is what it looks like from the road_1 160 - This is now what it looks like from The Library_2 161 - Docents Training session was held
The sidewalk
stone is
in place
The grass is
finally tall
enough to mow
This is what
it looks like
from the road
This is now
what it looks
like from The
Library
Docents' train-
ing session
was held
162 - Historic Site signs installed on Route 62 163 - Making sandwiches for the Grand Opening 164 - packing 300 lunches 165 - Schoolhouse Lunches ready to be served 166 - Cakes were ready
Historic Site
signs installed
on Rte 62
Making sand-
wiches for the
Grand Opening
Packing
300 lunches
Schoolhouse
lunches ready
to be served
Cakes were
ready