Schoolhouse #8
Activities at the School Street Site
page 11 of 21
The base for
the flagpole
is set in
concrete
The flagpole
being installed
Flag is
raised
Grading for
the sidewalk
The sidewalk
area was
compacted
The sidewalk
stone is
in place
The grass is
finally tall
enough to mow
This is what
it looks like
from the road
This is now
what it looks
like from The
Library
Docents' train-
ing session
was held
Historic Site
signs installed
on Rte 62
Making sand-
wiches for the
Grand Opening
Packing
300 lunches
Schoolhouse
lunches ready
to be served
Cakes were
ready