Schoolhouse #8
Activities at the School Street Site
Previous page 10 of 21 Next

137 - Construction of the landing begins 138 - Landing complete 139 - The restored, vintage railings arrive 140 - The railings being mounted 141 - The daffodils are blooming
Construction
of the landing
begins

Landing
complete
The restored,
vintage railings
arrive
The railings
being
mounted
The daffodils
are blooming
142 - Cleaning out holes for sign 143 - Posts in to support sign 144 - The sign arrives 145 - The sign is mounted 146 - Construction of the planter starts
Cleaning out
holes for sign
Posts in to
support sign
The sign
arrives
The sign is
mounted
Construction
of the planter
starts

147 - The finished planter with shrubs 148 - Preparing base for hand pump 149 - Hand pump is mounted 150 - Layout o f sidewalk and flagpole area 151 - Digging hole for flagpole
The finished
planter with
shrubs
Preparing
base for
hand pump
Hand pump
is mounted
Layout of
sidewalk and
flagpole area
Digging hole
for flagpole