Activities at the School Street Site
Previous page 2 of 21 Next

016 - Another Christmas shot 017 - Preparation work for driveway in Spring of 2004 018 - About to install water barrier 019 - First load of  shale arrives 020 - One of the truckers
Another
Christmas
shot
Prep work
for driveway
in Spring
of 2004
About to install
water barrier
First load of
shale arrives
One of the
truckers
021 - leveling the shale 022 - Good solid driveway completed 023 - Fire Department arrives to wash-down parking lot 024 - Clean parking lot 025 - Preparing shale workplace for mason
Leveling the
shale
Good solid
driveway
completed
Fire Dept
arrives to
wash-down
parking lot
Clean parking
lot
Preparing
shale work-
place for
mason
026 - Dry work surface ready 027 - Ready to start laying blocks 028 - Mixing mortar 029 - First corner 030 - Filling blocks with concrete
Dry work
surface
ready
Ready to
start laying
blocks
Mixing mortar First corner Filling blocks
with concrete