212 - Seat installed 213 - Sears & Roebuck catalog placed inside 214 - Applying Plexi over the doorway 215 - Path was cut to outhouse 216 - Completed path
Seat installed Sears &
Roebuck
catalog
placed inside
Applying
plexi over
the doorway
Path was
cut to
outhouse
Completed
path
217 - Mrs Reimer's class arrives 218 - Mrs Reimer from NCCS teaches her class 219 - Along the way we had Board meetings 220 - Mrs Kehr's class visited as part of their curriculum 221 - More trees were planted at the site
Mrs. Reimer's
class arrives
Mrs. Reimer
from NCCS
teaches her
class
Along the way
we had Board
meetings
Mrs. Kehr's
class visited
as part of their
curriculum
More trees
were planted
at the site
222 - More topsoil was spread in the back yard 223 - Some worked harder than others 224 - Security System was installed 225 - Solar panel installed to power security system 226 - Newsletters were generated and mailed
More topsoil
was spread
in the back
yard
Some worked
harder than
others
Security
system was
installed
Solar panel
installed to
power security
system
Newsletters
were generated
and mailed