001 - Initial layout of the Walk of Remembrance 002 - Sod was stripped 003 - Edging was installed 004 - Another 14  inches of dirt removed 005 - Tree roots were a challenge
Initial layout of
the Walk of
Remembrance
Sod was
stripped
Edging was
installed
Another 14
inches of
dirt removed
Tree roots were
a challenge
006 - In went 4 inches of slag 007 - Slag was well packed 008 - 4 inches of sand was added & Packed 009 - First 54 engraved bricks arrived 010 - The granite slabs weigh around unds
In went four
inches of slag
Slag was
well packed
Four inches of
sand was added
& packed
First 54 engraved
bricks arrived
The granite slabs
weigh around
120 pounds
011 - Leveling and re-leveling was the procedure 012 - First 12 bricks in place 013 - And then there were 54 bricks in place 014 - And then there were 108 bricks in place 015 - Many people came to the dedication ceremony
Leveling and
re-leveling was
the procedure
First 12 bricks
in place
And then there
were 54 bricks
in place
And then there
were 108 bricks
in place
Many people
came to the dedi-
cation ceremony